Application: Weld rod is melted and fused by means of a hot air welding gun, into a joint that has been grooved into the material. Usage: To create a tight edge fitment along the seam to provide a secure and serviceable join for general purpose locations. Installation: Heat welding should only be done after the flooring adhesive has set, usually the day following the installation and welded at a temperature of approximately 3500C. Material: PVC Unit: 1m lengths Light Reflective Values: 26 (Dementia Friendly) Storage before installation: Recommended between 150C and 250C
|